![]() The same applies for railings, but you can design railings not to need to tie into siding-holding them back to be self-supporting about two inches from the house.If the meter base is already installed, "you're screwed," says Doug, who then suggests sealing the house wrap to the meter base with flashing tape or caulk.Install a large piece of peel and stick behind the meter base.Lap it over the bottom house wrap and under the top.Slide a piece of house wrap into the slit.Install flexible flashing tape above the pipe, tucking it under the house wrap.Use flexible flashing tape below the pipe, overlapping the house wrap.Cut a flap above the pipe and fold it up and out of the way. ![]() We train people to hold the fasteners up away from the seams, and to tape over any such caps."įlash all pipes, vents, outlets, and blocks the same: shingle style, beginning at the bottom. "A great way to pour water into a taped seam is to tape halfway up a button-cap fastener. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |